La Reserve Hotel

  • May 23, 2017
  • 0 Comments

STM was approached to undertake a Flood Risk Assessment and create Surface Water Drainage Strategy for La Reserve Hotel London. The Flood and Drainage team utilized their experience of flood risk within central London and their knowledge of surface water drainage SuDS systems enabled a quick turn-around and allowed for flexibility and alterations to the design and drainage strategy.

 Read the full article here 



Leave a Reply